Combination 102 / 180
English Country Bespoke kitchen in the double-Island chef kitchen.
English Country Bespoke meets a 396 sq ft double-island kitchen, measured against its work triangle, aisle clearance, materials, and installed cost.
Budget
$152,000–$391,650
Per sq ft
$384–$989
Cabinetry
$69,700–$172,650
Appliances
$13,650–$34,150
Timeline
58–109 days
Counter surface
100 sq ft
The plan
Double-Island Chef Kitchen, drawn to scale.
Cabinet runs, sink, cooktop, refrigerator, door swing, windows, the 48-inch primary aisle, and the 18-foot work triangle are shown together. It is a planning drawing, not a permit set.
| Plan field | Measured value |
|---|---|
| Room type | Double-island kitchen |
| Occupancy | 3 to 6 cooks and guests |
| Dimensions | 18 × 22 ft |
| Floor area | 396 sq ft |
| Ceiling height | 10 ft |
| Work triangle | 18 ft |
| Primary aisle | 48 in |
| Counter run | 36 ft |
| Seating capacity | 4 seats |
| Complexity index | 1.32 |
| Heat / moisture | 8/10 |
| Slip / stain | 7.3/10 |
| Maintenance | Moderate |
| Install timeline | 58–109 days |
The route. Keep a 48 inch aisle between the islands and 42 inches around the perimeter. Do not place a stool in the route from the refrigerator to the prep sink. Confirm the oven and dishwasher door clearances.
The storage. Use the prep island for deep drawers and a pull-out bin. The dining island can hold linens, serving pieces, and a beverage refrigerator. A tall pantry on the west run keeps the work surfaces clear.
The ventilation. A wall hood over the range is the simplest solution. If a cooktop is on an island, choose a hood with a capture area larger than the cooktop and keep the duct run short.
The argument
Why this pairing works.
396 sq ft is enough for a complete english country bespoke kitchen when the work triangle is settled before the finish schedule. Keep a 48 inch aisle between the islands and 42 inches around the perimeter. Do not place a stool in the route from the refrigerator to the prep sink. Confirm the oven and dishwasher door clearances. This plan keeps the 18-foot triangle intact and lets honed carrara marble countertop carry the visual weight.
English Country Bespoke kitchens are built around a range wall and a deep sink. Painted cabinets, a stone or wood counter, a plate rack, and a worn brass tap create a room that feels older than the house. The style is expensive because it depends on custom millwork, but the payoff is a kitchen that can absorb family life without looking damaged. In this plan, honed carrara marble countertop sets the anchor, fluted white oak cabinetry supports it, and unlacquered brass faucet handles the technical layer. That trio keeps the palette coherent without turning the kitchen into a showroom.
Keep the sink, range, and refrigerator within a comfortable triangle even if the room is large. A 48 inch aisle is appropriate for a busy family kitchen, and the range wall should not become a corridor. The double-island kitchen adds its own rule: Each island should have one primary job: prep or dining, not both.
The budget model lands between $152,000–$391,650, or roughly $384 to $989 per square foot. Cabinetry is $69,700–$172,650 and appliances are $13,650–$34,150. The range assumes the room is weather-tight and free of structural repair.
The design moves
- 01
Draw the work triangle first
Keep a 48 inch aisle between the islands and 42 inches around the perimeter. Do not place a stool in the route from the refrigerator to the prep sink. Confirm the oven and dishwasher door clearances. The sink, cooking surface, and refrigerator should form a 18-foot triangle. No island, stool, or open dishwasher door should cut through it.
- 02
Repeat fluted white oak cabinetry
Use fluted white oak cabinetry once at the working plane and once at eye level. A material repeated twice looks intentional; a new finish at every surface makes a small kitchen look unresolved.
- 03
Keep the ventilation run short
A wall hood over the range is the simplest solution. If a cooktop is on an island, choose a hood with a capture area larger than the cooktop and keep the duct run short. A hood that turns through two elbows loses more performance than its CFM rating suggests. Put the hood on the shortest available wall or roof path and make up the air.
- 04
Finish with unlacquered brass faucet
A solid brass faucet with no lacquer, so it patinates from gold to bronze over time. Dry the faucet after use to limit uneven spotting.
The material schedule
Three materials, three jobs.
The selection engine gives each plan a counter surface, a cabinetry or storage layer, and a technical element. These three records are the specified trio for the English Country Bespoke kitchen in the Double-Island Chef Kitchen.
| Material | Role | Installed rate | Heat / moisture | Slip / stain | Upkeep | Build |
|---|---|---|---|---|---|---|
| Honed Carrara Marble Countertop | Surface / anchor | $85–$160per sqft | 5/10 | 4/10 | High | 7 d |
| Fluted White Oak Cabinetry | Cabinetry / support | $350–$750per linear ft | 6/10 | 6/10 | Moderate | 30 d |
| Unlacquered Brass Faucet | Technical layer | $450–$1,200per item | 9/10 | 5/10 | Moderate | 2 d |
Countertop
Honed Carrara Marble Countertop
Soft gray veining, a cool surface, and a patina that asks for care.
Cabinetry
Fluted White Oak Cabinetry
Ribbed oak fronts that add shadow and warmth without ornament.
Fixture
Unlacquered Brass Faucet
A living finish that darkens with every hand.
Material notes
- 1. Honed Carrara Marble Countertop. A metamorphic limestone with soft gray veining, honed to a matte finish that shows etching less than polished marble. Heat and moisture: 5/10. Slip and stain: 4/10. Maintenance: high; installation: 7 days.
- 2. Fluted White Oak Cabinetry. White oak cabinet fronts milled with a shallow vertical flute, finished with a matte hardwax oil or low-sheen lacquer. Heat and moisture: 6/10. Slip and stain: 6/10. Maintenance: moderate; installation: 30 days.
- 3. Unlacquered Brass Faucet. A solid brass faucet with no lacquer, so it patinates from gold to bronze over time. Heat and moisture: 9/10. Slip and stain: 5/10. Maintenance: moderate; installation: 2 days.
- 4. Undermount Workstation Sink. A deep single-basin sink with a sliding cutting board, colander, and drying rack. Heat and moisture: 10/10. Slip and stain: 8/10. Maintenance: low; installation: 3 days.
- 5. Pull-Out Pantry Larder. A full-height pull-out pantry with adjustable shelves, soft-close runners, and a stable frame. Heat and moisture: 8/10. Slip and stain: 8/10. Maintenance: low; installation: 2 days.
- 6. Butcher Block Walnut Island. A solid walnut or maple butcher block with a food-safe oil finish, used on an island or prep counter. Heat and moisture: 5/10. Slip and stain: 4/10. Maintenance: high; installation: 4 days.
- 7. Recessed Ceiling Spotlights. A set of recessed LED spotlights with a narrow beam, a high CRI, and a dimmable driver. Heat and moisture: 9/10. Slip and stain: 9/10. Maintenance: low; installation: 2 days.
- 8. Pot-Filler Wall Tap. A wall-mounted pot filler with an articulated arm, a cold-water supply, and a dedicated shutoff. Heat and moisture: 9/10. Slip and stain: 6/10. Maintenance: moderate; installation: 3 days.
- 9. Soapstone Prep Counter. A talc-rich metamorphic stone with a soft gray surface that patinas with oil and use. Heat and moisture: 9/10. Slip and stain: 5/10. Maintenance: moderate; installation: 8 days.
- 10. Zellige Ceramic Backsplash. A hand-made clay tile with a reactive glaze, irregular edges, and a glossy surface that reflects light. Heat and moisture: 9/10. Slip and stain: 6/10. Maintenance: moderate; installation: 5 days.
- 11. Integrated Wall Oven & Steam Combi. A built-in oven pair with a steam combi function, designed for a tall cabinet and a dedicated 240V circuit. Heat and moisture: 8/10. Slip and stain: 8/10. Maintenance: moderate; installation: 4 days.
- 12. Porcelain Large-Format Slab. A large-format porcelain slab with a printed stone or concrete pattern, used on counters and backsplashes. Heat and moisture: 9/10. Slip and stain: 9/10. Maintenance: low; installation: 6 days.
- 13. Induction Cooktop 36-Inch. A 36-inch induction cooktop with four or five zones, touch controls, and a smooth glass surface. Heat and moisture: 9/10. Slip and stain: 9/10. Maintenance: low; installation: 2 days.
- 14. Quartzite Taj Mahal Slab. A natural quartzite with a warm white field and subtle gold-gray veins, harder and more stain-resistant than marble. Heat and moisture: 8/10. Slip and stain: 7/10. Maintenance: low; installation: 10 days.
- 15. Brushed Stainless Appliance Suite. A refrigerator, range, dishwasher, and hood in brushed stainless, with a consistent handle and finish. Heat and moisture: 8/10. Slip and stain: 7/10. Maintenance: low; installation: 5 days.
- 16. Concealed Downdraft Range Hood. A downdraft ventilator that sits behind or beside the cooktop and retracts into the counter. Heat and moisture: 8/10. Slip and stain: 7/10. Maintenance: moderate; installation: 3 days.
- 17. Rattan & Walnut Barstools. A counter-height stool with a solid walnut frame and a woven rattan or cane seat. Heat and moisture: 7/10. Slip and stain: 6/10. Maintenance: moderate; installation: 0 days.
- 18. Under-Cabinet LED Task Strip. A low-profile LED strip with a diffuser, a dimmable driver, and a high color-rendering index. Heat and moisture: 9/10. Slip and stain: 9/10. Maintenance: low; installation: 1 day.
- 19. Terrazzo Floor Tile. A cement or resin terrazzo tile with marble, glass, or stone chips, finished matte or honed. Heat and moisture: 8/10. Slip and stain: 7/10. Maintenance: low; installation: 7 days.
- 20. Matte Fenix Laminate Cabinets. A thermally healed laminate with a low-reflectance surface, used on flat cabinet fronts. Heat and moisture: 7/10. Slip and stain: 8/10. Maintenance: low; installation: 25 days.
The cost model
What the combination costs.
The estimate includes design, demolition, cabinetry, countertops, backsplash, appliances, plumbing, electrical, flooring, ventilation, installation labor, and contingency. The plan is 396 sq ft with a 36-foot cabinet run.
| Cost line | Low | High | Share of high |
|---|---|---|---|
| Design and planningMeasured plan, cabinet and appliance schedule, lighting layout, and purchasing coordination. | $17,000 | $41,400 | 11% |
| Demolition and protectionCabinet and counter removal, floor protection, dust control, and disposal. | $3,100 | $7,550 | 2% |
| Cabinetry and millwork36 linear feet of base and wall cabinets, plus fillers, panels, and one tall storage run. | $69,700 | $172,650 | 44% |
| Countertops100 sq ft of counter surface including edge profile, cutouts, and installation. | $8,500 | $16,000 | 4% |
| Backsplash and wall finishesBacksplash field, paint or plaster, patching, and trim at the cabinet line. | $3,700 | $10,150 | 3% |
| AppliancesRange or cooktop, refrigeration, dishwasher, ventilation, and one built-in oven or microwave. | $13,650 | $34,150 | 9% |
| Plumbing and sinkSink, faucet, supply and drain adjustments, shutoff valves, and permit inspection. | $3,950 | $10,100 | 3% |
| Electrical and lightingDedicated appliance circuits, task and ambient lighting, dimming, and outlet relocation. | $4,000 | $11,500 | 3% |
| FlooringFloor finish, underlayment, transitions, and an allowance for subfloor repair. | $3,450 | $10,800 | 3% |
| Ventilation and ductingHood, duct run, roof or wall cap, makeup-air review, and commissioning. | $1,550 | $4,900 | 1% |
| Installation laborCabinet setting, counter template, appliance install, trim, touch-up, and site supervision. | $9,600 | $24,350 | 6% |
| ContingencyA working reserve for hidden conditions, lead-time changes, and freight. | $13,800 | $48,100 | 12% |
| Total project | $152,000 | $391,650 | $384–$989 / sq ft |
Estimated $152,000–$391,650 total / $384–$989 per sq ft / 58–109 working days.
What moves the number
- Cabinetry is $69,700–$172,650 for the 36-foot run.
- Appliances are $13,650–$34,150 before any pro-style upgrade.
- The counter surface is 100 sq ft, including an island if the plan has one.
- Complexity index 1.32 raises labor and schedule risk.
Planning range only. Excludes structural repair, asbestos abatement, permit surcharges, and owner-supplied appliances.
The watch-outs
What can go wrong in this plan.
The combination is a fit, not a guarantee. These are the four issues most likely to change the cost or the schedule.
Watch-out 01
Custom cabinetry is expensive and has a long lead time.
Watch-out 02
The plan can feel like a restaurant if the lighting is too bright.
Watch-out 03
Oil, wine, and turmeric can stain if the sealer is tired.
Watch-out 04
Custom fluted fronts are expensive and slow to produce.
Room fit
The published ideal range for English Country Bespoke is 140 sq ft–480 sq ft. This plan is 396 sq ft.
Aisle check
The primary aisle is 48 inches. Measure to the appliance handles and the open oven door, not the cabinet box.
The trade-offs
The honest version.
A good combination page shows both sides of the pairing.
What works
- Custom joinery can solve awkward walls and uneven ceilings.
- Two islands separate prep from gathering and entertaining.
- The soft veining adds depth without a busy pattern.
- The vertical shadow adds warmth without a decorative panel.
- The patina adds warmth and a sense of age.
- Painted cabinets can be repaired and repainted over time.
What to watch
- Custom cabinetry is expensive and has a long lead time.
- Two islands require a large room and a high budget.
- Acidic foods etch the surface and leave dull marks.
- The flutes collect dust and cooking grease.
- It spots and darkens unevenly.
- Painted finishes chip and need touch-up.
Four related plans
Same logic, different room.
The next four combinations share a style, a layout, or a material with this plan. Each one has its own measured drawing, work triangle, and cost range.
English Country Bespoke / Peninsula kitchen
001Peninsula Open-Plan Kitchen
- Size
- 16 × 20 ft
- Budget
- $114,750–$298,750
- Build
- 58–104 d
English Country Bespoke / Open-concept kitchen
002Open-Concept Living-Kitchen
- Size
- 20 × 24 ft
- Budget
- $148,950–$388,350
- Build
- 58–108 d
Contemporary Luxury / Double-island kitchen
003Double-Island Chef Kitchen
- Size
- 18 × 22 ft
- Budget
- $174,200–$468,650
- Build
- 65–119 d
Warm Brutalism / Double-island kitchen
004Double-Island Chef Kitchen
- Size
- 18 × 22 ft
- Budget
- $118,600–$313,350
- Build
- 54–104 d
Read next
Guides for this plan.
The clearance, ventilation, and lighting questions usually decide the final drawing.
Kitchen planning / 5 min
G01Work Triangle Leg Dimensions
A measured guide to the sink-cook-fridge triangle, including leg lengths, total travel, obstruction rules, and plan-specific exceptions.
Ventilation / 4 min
G02Range Hood CFM & Duct Sizing
A technical guide to hood sizing, capture area, duct velocity, equivalent length, and the ventilation details that make a kitchen work.
Countertops / 4 min
G03Countertop Hardness, Stain & Heat
A material-by-material guide to Mohs hardness, heat resistance, stain and etch risk, edge durability, and sealing for kitchen counters.
FAQ
English Country Bespoke in the Double-Island Chef Kitchen.
Practical answers drawn from the specification, cost model, and installation sequence.