Industrial Steel & ConcreteDouble-island kitchen396 sq ft18 ft triangle48 in aisle

Combination 042 / 180

Industrial Steel & Concrete kitchen in the double-Island chef kitchen.

Industrial Steel & Concrete meets a 396 sq ft double-island kitchen, measured against its work triangle, aisle clearance, materials, and installed cost.

Budget

$107,750–$280,400

Per sq ft

$272–$708

Cabinetry

$36,700–$92,050

Appliances

$10,250–$27,300

Timeline

51–99 days

Counter surface

100 sq ft

The plan

Double-Island Chef Kitchen, drawn to scale.

Cabinet runs, sink, cooktop, refrigerator, door swing, windows, the 48-inch primary aisle, and the 18-foot work triangle are shown together. It is a planning drawing, not a permit set.

Open layout
Double-Island Chef Kitchen in Industrial Steel & Concrete kitchen planMeasured kitchen at 18 by 22 feet with cabinet runs, sink, cooking, refrigeration, 48 inch aisle, and a 18 foot work triangle.CLEAN ZONECOOK ZONEPREP ISLANDCOLD STORAGEDINING ISLAND48 IN AISLENorth runSouth runWest runSinkDishwasherRangeHoodRefrigeratorWall ovenPantryPrep islandPrep sinkDining islandWindowWindowEntry123WORK TRIANGLE 18′48″ AISLERange wall18′ WIDE22′ LONG6 FTN
48 in aisle18 ft work triangleCabinet runSink / wetCookingDrawing: 18′ × 22′ / 10′ ceiling
18 × 22 ft / 10 ft ceiling36 ft cabinet run / 4 seats
Plan schedule for the Industrial Steel & Concrete kitchen in the Double-Island Chef Kitchen.
Plan fieldMeasured value
Room typeDouble-island kitchen
Occupancy3 to 6 cooks and guests
Dimensions18 × 22 ft
Floor area396 sq ft
Ceiling height10 ft
Work triangle18 ft
Primary aisle48 in
Counter run36 ft
Seating capacity4 seats
Complexity index1.32
Heat / moisture8.3/10
Slip / stain8/10
MaintenanceModerate
Install timeline51–99 days

The route. Keep a 48 inch aisle between the islands and 42 inches around the perimeter. Do not place a stool in the route from the refrigerator to the prep sink. Confirm the oven and dishwasher door clearances.

The storage. Use the prep island for deep drawers and a pull-out bin. The dining island can hold linens, serving pieces, and a beverage refrigerator. A tall pantry on the west run keeps the work surfaces clear.

The ventilation. A wall hood over the range is the simplest solution. If a cooktop is on an island, choose a hood with a capture area larger than the cooktop and keep the duct run short.

The argument

Why this pairing works.

The double-Island chef kitchen and industrial steel & concrete share a preference for one clear working sequence. The 18 by 22 foot double-island kitchen separates prep from gathering. One island holds the sink, cutting board, and cold storage; the other holds seating and a second sink or cooktop. The plan only works in a large room: two islands need at least 48 inches between them and a clear route around both. The result reads as a blackened steel, exposed structure, and a counter that can take a hit. rather than a catalogue of separate appliances.

Industrial Steel & Concrete kitchens treat the room as a workshop with better light. Exposed brick or board-formed concrete, blackened steel shelving, a heavy stone counter, and a stainless appliance suite create a palette that improves with use. The style is at its best when the materials are real and the details are few. In this plan, soapstone prep counter sets the anchor, pull-out pantry larder supports it, and under-cabinet led task strip handles the technical layer. That trio keeps the palette coherent without turning the kitchen into a showroom.

The triangle can be larger in an industrial kitchen, but the path must stay clear. Keep the sink and range on the same run where possible, and place the refrigerator outside the main traffic route. The double-island kitchen adds its own rule: Each island should have one primary job: prep or dining, not both.

The budget model lands between $107,750–$280,400, or roughly $272 to $708 per square foot. Cabinetry is $36,700–$92,050 and appliances are $10,250–$27,300. The range assumes the room is weather-tight and free of structural repair.

The design moves

  1. 01

    Anchor with soapstone prep counter

    A talc-rich metamorphic stone with a soft gray surface that patinas with oil and use. It has a heat-and-moisture rating of 9/10 and a slip-and-stain rating of 5/10. Place it where the working zone needs the most protection, then let the other finishes follow.

  2. 02

    Keep the ventilation run short

    A wall hood over the range is the simplest solution. If a cooktop is on an island, choose a hood with a capture area larger than the cooktop and keep the duct run short. A hood that turns through two elbows loses more performance than its CFM rating suggests. Put the hood on the shortest available wall or roof path and make up the air.

  3. 03

    Repeat pull-out pantry larder

    Use pull-out pantry larder once at the working plane and once at eye level. A material repeated twice looks intentional; a new finish at every surface makes a small kitchen look unresolved.

  4. 04

    Finish with under-cabinet led task strip

    A low-profile LED strip with a diffuser, a dimmable driver, and a high color-rendering index. Dust the lens and channel every few months.

The material schedule

Three materials, three jobs.

The selection engine gives each plan a counter surface, a cabinetry or storage layer, and a technical element. These three records are the specified trio for the Industrial Steel & Concrete kitchen in the Double-Island Chef Kitchen.

All 20 materials
Selected materials for the Industrial Steel & Concrete kitchen in the Double-Island Chef Kitchen, with role, installed rate, heat and moisture, slip and stain, maintenance, and installation timeline.
MaterialRoleInstalled rateHeat / moistureSlip / stainUpkeepBuild
Soapstone Prep CounterSurface / anchor$90–$170per sqft9/105/10Moderate8 d
Pull-Out Pantry LarderCabinetry / support$1,800–$5,500per unit8/108/10Low2 d
Under-Cabinet LED Task StripTechnical layer$18–$45per linear ft9/109/10Low1 d

Material notes

  1. 1. Soapstone Prep Counter. A talc-rich metamorphic stone with a soft gray surface that patinas with oil and use. Heat and moisture: 9/10. Slip and stain: 5/10. Maintenance: moderate; installation: 8 days.
  2. 2. Pull-Out Pantry Larder. A full-height pull-out pantry with adjustable shelves, soft-close runners, and a stable frame. Heat and moisture: 8/10. Slip and stain: 8/10. Maintenance: low; installation: 2 days.
  3. 3. Under-Cabinet LED Task Strip. A low-profile LED strip with a diffuser, a dimmable driver, and a high color-rendering index. Heat and moisture: 9/10. Slip and stain: 9/10. Maintenance: low; installation: 1 day.
  4. 4. Induction Cooktop 36-Inch. A 36-inch induction cooktop with four or five zones, touch controls, and a smooth glass surface. Heat and moisture: 9/10. Slip and stain: 9/10. Maintenance: low; installation: 2 days.
  5. 5. Brushed Stainless Appliance Suite. A refrigerator, range, dishwasher, and hood in brushed stainless, with a consistent handle and finish. Heat and moisture: 8/10. Slip and stain: 7/10. Maintenance: low; installation: 5 days.
  6. 6. Pot-Filler Wall Tap. A wall-mounted pot filler with an articulated arm, a cold-water supply, and a dedicated shutoff. Heat and moisture: 9/10. Slip and stain: 6/10. Maintenance: moderate; installation: 3 days.
  7. 7. Terrazzo Floor Tile. A cement or resin terrazzo tile with marble, glass, or stone chips, finished matte or honed. Heat and moisture: 8/10. Slip and stain: 7/10. Maintenance: low; installation: 7 days.
  8. 8. Recessed Ceiling Spotlights. A set of recessed LED spotlights with a narrow beam, a high CRI, and a dimmable driver. Heat and moisture: 9/10. Slip and stain: 9/10. Maintenance: low; installation: 2 days.
  9. 9. Integrated Wall Oven & Steam Combi. A built-in oven pair with a steam combi function, designed for a tall cabinet and a dedicated 240V circuit. Heat and moisture: 8/10. Slip and stain: 8/10. Maintenance: moderate; installation: 4 days.
  10. 10. Porcelain Large-Format Slab. A large-format porcelain slab with a printed stone or concrete pattern, used on counters and backsplashes. Heat and moisture: 9/10. Slip and stain: 9/10. Maintenance: low; installation: 6 days.
  11. 11. Undermount Workstation Sink. A deep single-basin sink with a sliding cutting board, colander, and drying rack. Heat and moisture: 10/10. Slip and stain: 8/10. Maintenance: low; installation: 3 days.
  12. 12. Concealed Downdraft Range Hood. A downdraft ventilator that sits behind or beside the cooktop and retracts into the counter. Heat and moisture: 8/10. Slip and stain: 7/10. Maintenance: moderate; installation: 3 days.
  13. 13. Quartzite Taj Mahal Slab. A natural quartzite with a warm white field and subtle gold-gray veins, harder and more stain-resistant than marble. Heat and moisture: 8/10. Slip and stain: 7/10. Maintenance: low; installation: 10 days.
  14. 14. Rattan & Walnut Barstools. A counter-height stool with a solid walnut frame and a woven rattan or cane seat. Heat and moisture: 7/10. Slip and stain: 6/10. Maintenance: moderate; installation: 0 days.
  15. 15. Matte Fenix Laminate Cabinets. A thermally healed laminate with a low-reflectance surface, used on flat cabinet fronts. Heat and moisture: 7/10. Slip and stain: 8/10. Maintenance: low; installation: 25 days.
  16. 16. Unlacquered Brass Faucet. A solid brass faucet with no lacquer, so it patinates from gold to bronze over time. Heat and moisture: 9/10. Slip and stain: 5/10. Maintenance: moderate; installation: 2 days.
  17. 17. Zellige Ceramic Backsplash. A hand-made clay tile with a reactive glaze, irregular edges, and a glossy surface that reflects light. Heat and moisture: 9/10. Slip and stain: 6/10. Maintenance: moderate; installation: 5 days.
  18. 18. Fluted White Oak Cabinetry. White oak cabinet fronts milled with a shallow vertical flute, finished with a matte hardwax oil or low-sheen lacquer. Heat and moisture: 6/10. Slip and stain: 6/10. Maintenance: moderate; installation: 30 days.
  19. 19. Honed Carrara Marble Countertop. A metamorphic limestone with soft gray veining, honed to a matte finish that shows etching less than polished marble. Heat and moisture: 5/10. Slip and stain: 4/10. Maintenance: high; installation: 7 days.
  20. 20. Butcher Block Walnut Island. A solid walnut or maple butcher block with a food-safe oil finish, used on an island or prep counter. Heat and moisture: 5/10. Slip and stain: 4/10. Maintenance: high; installation: 4 days.

The cost model

What the combination costs.

The estimate includes design, demolition, cabinetry, countertops, backsplash, appliances, plumbing, electrical, flooring, ventilation, installation labor, and contingency. The plan is 396 sq ft with a 36-foot cabinet run.

See all benchmarks
Estimated cost lines for the Industrial Steel & Concrete kitchen in the Double-Island Chef Kitchen.
Cost lineLowHighShare of high
Design and planningMeasured plan, cabinet and appliance schedule, lighting layout, and purchasing coordination.$13,950$34,00012%
Demolition and protectionCabinet and counter removal, floor protection, dust control, and disposal.$3,100$7,5503%
Cabinetry and millwork36 linear feet of base and wall cabinets, plus fillers, panels, and one tall storage run.$36,700$92,05033%
Countertops100 sq ft of counter surface including edge profile, cutouts, and installation.$9,000$17,0006%
Backsplash and wall finishesBacksplash field, paint or plaster, patching, and trim at the cabinet line.$3,450$9,4003%
AppliancesRange or cooktop, refrigeration, dishwasher, ventilation, and one built-in oven or microwave.$10,250$27,30010%
Plumbing and sinkSink, faucet, supply and drain adjustments, shutoff valves, and permit inspection.$3,400$8,6503%
Electrical and lightingDedicated appliance circuits, task and ambient lighting, dimming, and outlet relocation.$4,000$11,5004%
FlooringFloor finish, underlayment, transitions, and an allowance for subfloor repair.$2,950$9,2503%
Ventilation and ductingHood, duct run, roof or wall cap, makeup-air review, and commissioning.$1,550$4,9002%
Installation laborCabinet setting, counter template, appliance install, trim, touch-up, and site supervision.$9,600$24,3509%
ContingencyA working reserve for hidden conditions, lead-time changes, and freight.$9,800$34,45012%
Total project$107,750$280,400$272–$708 / sq ft

Estimated $107,750–$280,400 total / $272–$708 per sq ft / 51–99 working days.

What moves the number

  • Cabinetry is $36,700–$92,050 for the 36-foot run.
  • Appliances are $10,250–$27,300 before any pro-style upgrade.
  • The counter surface is 100 sq ft, including an island if the plan has one.
  • Complexity index 1.32 raises labor and schedule risk.

Planning range only. Excludes structural repair, asbestos abatement, permit surcharges, and owner-supplied appliances.

The watch-outs

What can go wrong in this plan.

The combination is a fit, not a guarantee. These are the four issues most likely to change the cost or the schedule.

Watch-out 01

Dark palettes can make a small kitchen feel like a tunnel.

Watch-out 02

The distance between islands can become a barrier if the aisle is too wide.

Watch-out 03

It is not a uniform, bright surface.

Watch-out 04

The runners have a load limit.

Room fit

The published ideal range for Industrial Steel & Concrete is 120 sq ft–420 sq ft. This plan is 396 sq ft.

Aisle check

The primary aisle is 48 inches. Measure to the appliance handles and the open oven door, not the cabinet box.

The trade-offs

The honest version.

A good combination page shows both sides of the pairing.

What works

  • Soapstone, steel, and concrete hide wear better than a glossy white kitchen.
  • Two islands separate prep from gathering and entertaining.
  • It is non-porous and does not need a sealer.
  • It makes a narrow cabinet fully accessible.
  • It lights the work surface without glare.
  • The palette suits open-plan lofts and exposed structural ceilings.

What to watch

  • Hard surfaces reflect sound and make a busy kitchen louder.
  • Two islands require a large room and a high budget.
  • It is soft and scratches from knives and pans.
  • The runners have a load limit.
  • The driver needs an accessible location.
  • Concrete and soapstone need sealing and a careful cleaning routine.

Four related plans

Same logic, different room.

The next four combinations share a style, a layout, or a material with this plan. Each one has its own measured drawing, work triangle, and cost range.

Open the matrix

Industrial Steel & Concrete / Peninsula kitchen

001

Peninsula Open-Plan Kitchen

Size
16 × 20 ft
Budget
$82,900–$217,550
Build
48–89 d
Soapstone Prep CounterFluted White Oak CabinetryPot-Filler Wall TapInduction Cooktop 36-InchUnder-Cabinet LED Task StripBrushed Stainless Appliance SuiteTerrazzo Floor TileRecessed Ceiling SpotlightsPorcelain Large-Format SlabUndermount Workstation SinkConcealed Downdraft Range HoodIntegrated Wall Oven & Steam CombiQuartzite Taj Mahal SlabZellige Ceramic BacksplashRattan & Walnut BarstoolsButcher Block Walnut IslandPull-Out Pantry LarderMatte Fenix Laminate CabinetsUnlacquered Brass FaucetHoned Carrara Marble Countertop
Open the plan

Industrial Steel & Concrete / Open-concept kitchen

002

Open-Concept Living-Kitchen

Size
20 × 24 ft
Budget
$109,950–$287,350
Build
48–93 d
Soapstone Prep CounterMatte Fenix Laminate CabinetsPot-Filler Wall Tap
Open the plan

Shaker Transitional / Double-island kitchen

004

Double-Island Chef Kitchen

Size
18 × 22 ft
Budget
$111,300–$293,950
Build
51–99 d
Porcelain Large-Format SlabPull-Out Pantry LarderUnlacquered Brass Faucet
Open the plan

Read next

Guides for this plan.

The clearance, ventilation, and lighting questions usually decide the final drawing.

All guides

Kitchen planning / 5 min

G01

Work Triangle Leg Dimensions

A measured guide to the sink-cook-fridge triangle, including leg lengths, total travel, obstruction rules, and plan-specific exceptions.

5 sectionsRead →

Clearances / 4 min

G02

Kitchen Aisle Clearance Standards

A practical guide to kitchen aisle widths, appliance door clearances, seating clearance, and the difference between a code minimum and a comfortable work zone.

4 sectionsRead →

Ventilation / 4 min

G03

Range Hood CFM & Duct Sizing

A technical guide to hood sizing, capture area, duct velocity, equivalent length, and the ventilation details that make a kitchen work.

4 sectionsRead →

FAQ

Industrial Steel & Concrete in the Double-Island Chef Kitchen.

Practical answers drawn from the specification, cost model, and installation sequence.

What makes Industrial Steel & Concrete work in a double-Island chef kitchen?
Industrial Steel & Concrete works here because two islands, two jobs, and a kitchen built for a crowd. The plan keeps a 48-inch aisle and a 18-foot work triangle while using concrete, black steel, brick. Soapstone Prep Counter carries the working surface, so the style does not depend on decorative objects.
What should I budget for this double-island kitchen?
The planning model shows $107,750–$280,400 for a complete kitchen, including design, demolition, cabinetry, countertops, appliances, plumbing, electrical, flooring, ventilation, installation, and contingency. Cabinetry alone is $36,700–$92,050. Regional labor rates, panel-ready appliances, and structural work move the range more than paint or hardware.
Can I use soapstone prep counter in a 396 sq ft kitchen?
Soapstone Prep Counter is rated for rooms from 80 to 400 square feet, so this plan sits inside its ideal range. Its heat-and-moisture rating is 9/10 and its slip-and-stain rating is 5/10. Confirm the delivered slab or cabinet depth before the order is released.
Which decision should come first?
Settle the work triangle and the main aisle before choosing the countertop or the cabinet color. Keep a 48 inch aisle between the islands and 42 inches around the perimeter. Do not place a stool in the route from the refrigerator to the prep sink. Confirm the oven and dishwasher door clearances. Once the route is fixed, soapstone prep counter and pull-out pantry larder can be sized against a real footprint instead of a mood board.